Lenoir Wassersperre in GrĂĽn, ausgelegt auf einer Hofeinfahrt zum Starkregenschutz

Flood & heavy rain protection

Flood protection in three stages

Beaver tube dam, Lenoir® barriers and pumping technology, ordered by how a severe weather incident unfolds. So you can see at once what your phase needs and what is still missing for the one after.

  • 8 items, from system setup to recovery
  • Order directly or request a custom quote
  • Advice for fire departments, THW, municipalities and KRITIS
Prepare: before the water arrives

Stage 01

Prepare: before the water arrives

As long as the incident is foreseeable a few hours in advance, the Beaver tube dam can be deployed to full effect:

What must be settled in this phase

  • Define the route and length of the protective line
  • Determine the damming height needed per section
  • Weigh setup time and personnel needs against the warning time
  • Plan for transport, storage space and re-stowing the barrier

Equipment for this stage

Beaver Flood Fence

Base elements straight and at a 90° angle, extendable section by section. That way even short lines, corners and individual structures can be neatly enclosed.

  • Damming height 45 cm
  • Base element 100 cm
Ab €201,11 Konfigurierbar, direkt bestellbar Zum Produkt
Die Lenoir Wassersperre bei Realeinsatz zum Schutz einer denkmalgeschĂĽtzten Kapelle

Stage 02

Defend: openings and danger points sealed

The Lenoir barriers enable a fast response even during the storm. The Lenoir heavy rain barrier can be laid out by one person in a matter of seconds to seal factory gates and protect underground garages.

What must be settled in this phase

  • Record every opening in the protected area: doors, gates, shafts, inlets
  • Document each opening's dimensions: they decide the right barrier
  • Define which access points must stay passable during the response
  • Treat hazmat storage, drains and sewer inlets separately

Equipment for this stage

Wasserschlucker im Wasserbecken: der gelbe Trichter nimmt das vom Schieber zugefĂĽhrte Wasser auf

Stage 03

Recover: water out, surfaces clear

If water has come over after all, we also have the right equipment to pump out basements quickly and effectively, push the water off and clean the roads.

What must be settled in this phase

  • Residual water that pumps can no longer remove
  • Squeegee surfaces, stairs and hall floors and make them walkable
  • Plan for deployments beyond 24 hours: hygiene and crew care
  • Clear roadways and paved surfaces of mud and flood debris
  • Plan for cleaning, drying and re-stowing the equipment

Equipment for this stage

SnakE® Spray Bar (no nozzles)

In the recovery phase, for rinsing off roadways and paved surfaces: mud and flood debris can be flushed away from the vehicle instead of being pushed by hand. Originally developed for vegetation firefighting.

  • mounts tool-free on the vehicle
  • Working width: 3 m
€650,00 Direkt bestellbar Zum Produkt

Procurement

A response concept, not parts

Tell us your protection goal, potential openings and warning time; we recommend the right combination from the three stages and put together a quote for you.

  • Sizing based on your site: protective line, openings, warning time
  • A quote with line items and prices for your procurement office
  • On-site demonstration: date on request