Stage 01
Prepare before the water arrives
If the flooding is foreseeable a few hours in advance, the Beaver tube dam plays to its strengths: a small team lays around 100 meters of protective line per hour, without heavy equipment, even on uneven ground. Where the surface is level and firm, the Flood Fence closes off corners and short sections.
What must be settled in this phase
- Define the route and length of the protective line
- Determine the damming height needed per section
- Weigh setup time and personnel needs against the warning time
- Plan for transport, storage space and re-stowing the barrier